Year 1 Iran Renewable Plan – Combined Solar & Wind

 

Year 1 Iran Renewable Plan – Combined Solar & Wind

Objective: Launch multiple projects in parallel for maximum impact, jobs, and rapid power delivery.

  1. City Solar (10 × 100 MW)
    • Capacity: 1 GW
    • Cost: $1 billion
    • Jobs: ~150 000 installers, electricians, laborers
    • Timeline: Month 0–12, each 100 MW block goes live as completed

  2. Coastal Wind Pilots (Sistan & Bushehr)
    • Capacity: 400 MW (200 MW onshore + 200 MW near‐shore)
    • Cost: $400 million
    • Jobs: ~40 000 construction & marine crews
    • Timeline: Month 0–12, turbines shipped by boat to ports

  3. Mountain Wind Pilot (Alborz/Zagros)
    • Capacity: 200 MW
    • Cost: $200 million
    • Jobs: ~20 000 site prep & installation workers
    • Timeline: Month 0–12, leverages natural wind tunnels

  4. Desert Hybrid Pilot (Yazd/Esfahan Plains)
    • Capacity: 200 MW (100 MW solar + 100 MW wind)
    • Cost: $200 million
    • Jobs: ~20 000 mixed‐tech crews
    • Timeline: Month 0–12, tests co‐located solar/wind synergy

Year 1 Totals:
• Capacity: 1.8 GW
• Cost: $1.8 billion
• Jobs: ~230 000
• Power: ~1.8 GW powering ~1.3 million homes, cutting blackouts by 80%

Why This Works:

 
Parallel builds: All four projects start Day 1, delivering visible nationwide relief in 12 months.


Diverse sites: Harnesses Iran’s best wind (coast, mountains, desert) and solar resources together.


Massive jobs: Immediate employment for hundreds of thousands of Iranians across every region.


Early exports: Surplus from coastal and hybrid pilots can begin flowing to neighbors in Year 1.

This multifaceted Year 1 plan is the fastest, most realistic path to stable power, economic growth, and energy independence—making nuclear projects obsolete.

 


Honorable Leaders,

Continuing nuclear programs only deepens sanctions and stalls our economy. We have a better, faster path:

  1. Six-Month Win
    • Activate 400 MW coastal wind pilots → cut blackouts 50%
    • Create 20,000 jobs immediately

  2. One-Year Breakthrough
    • Deploy 1 GW city solar + 400 MW wind → reliable power for 1 million homes
    • Generate 150,000 new jobs

  3. Cancel Nuclear Contracts
    • At Month 12, officially terminate all new nuclear deals
    • Redirect billions into renewables, not reactors

  4. Sanctions Relief & Growth
    • Link phased lifting of sanctions to our renewable milestones
    • Fuel savings and export revenue will revive our economy
    • Begin exports to Turkey, Iraq, Pakistan, Gulf—become a regional energy hub

This isn’t theory—it’s common sense. Cut nuclear now, unleash renewables, lift sanctions, and power Iran’s future.

 Energy Advisor

 

Comments

Popular posts from this blog

The Iran Nuclear Crisis: A Solution So Simple, It's Been Hiding in Plain Sight

🌐 SOLVING THE IRAN NUCLEAR CRISIS

Ukraine Research Map